Buyer's GuideApril 9, 2026 • 12 min read

The Ultimate Guide to Bathroom Partition Manufacturers (2026)

There are only six major bathroom partition factories in the United States — and each one has a different superpower. Pick the wrong manufacturer and you'll overpay, wait weeks longer than you should, or end up with the wrong material for the environment. This is the complete, no-fluff guide to ASI Global, Hadrian, All American (AAMCO), Scranton Products, Bobrick, and Metpar — with lead times, pricing, warranties, strengths, and trade-offs.

Or skip the research and let Partition Pros source the best manufacturer for your project — at factory-direct pricing, with one point of contact for quote, submittals, production, and installation.

Industry Overview

Why Manufacturer Choice Actually Matters

The U.S. commercial toilet partition market is projected to hit $2.68 billion by 2030 — and yet it is served by only a handful of factories. That concentration means choosing the right manufacturer isn't a nice-to-have: it's the single biggest decision that will determine your project's cost, schedule, and finish quality.

Each factory has a specialty. ASI Global has the widest material selection. Hadrian has the best software and tightest freight control. All American runs the fastest stainless steel in the country. Scranton owns premium HDPE. Bobrick owns architectural phenolic. Metpar is a regional play for the Southeast. There is no "best" manufacturer — there is only the best manufacturer for your specific project.

At A Glance

Who's the King of Each Material

If you already know what material you need, here's the fastest way to the right factory. We'll explain the details below.

Solid Plastic (HDPE)
Scranton Products
Also: AAMCO (best value) · ASI (vertical HDPE)
Phenolic
Bobrick
Also: ASI (2-day Fast Track)
Powder Coated Steel
Hadrian
Also: AAMCO (colors + price)
Stainless Steel
All American (AAMCO)
Also: Hadrian · ASI
Plastic Laminate
ASI Global
Also: Bobrick · AAMCO
Factory Deep Dives

Every Major U.S. Partition Manufacturer

A factory-by-factory breakdown: who they are, what they're good at, what they're not, and where they fit in your project.

ASI Global Partitions logo

ASI Global Partitions

The Widest Selection, Fastest Across the Board

Atlanta, GA
King of Widest Material Selection
2 business days (all 5 materials)

ASI Global Partitions — headquartered in Atlanta, Georgia — has the widest product selection of any toilet partition factory in North America and is the only manufacturer capable of shipping every material (powder coated steel, stainless steel, solid plastic, phenolic, and plastic laminate) in 2 business days through their Global Fast Track program. ASI is also the only factory in the industry that extrudes its own HDPE sheet, giving them full vertical control over their solid plastic supply chain. Their plastic laminate is the lowest-priced laminate on the market, and privacy hardware (no-sightline stiles) comes built in by default on most configurations.

Strengths
  • Only factory shipping all 5 materials in 2 business days
  • Only U.S. manufacturer that extrudes its own solid plastic (HDPE)
  • Lowest-priced plastic laminate in the industry
  • Built-in privacy hardware by default (no-sightline stiles)
  • Black Core Phenolic and Plastic Laminate both 2-day Fast Track
  • Largest parts and replacement inventory in the industry
  • Excellent customer service and ASI corporate backing
Trade-offs
  • Powder coated steel and solid plastic priced higher than competitors
  • Not the cheapest choice for budget-driven metal projects
Material Lead Times
Plastic Laminate
2 days
Black Core Phenolic
2 days
Solid Plastic (HDPE)
2 days
Powder Coated Steel
2 days
Stainless Steel
2 days
Hadrian Manufacturing logo

Hadrian Manufacturing

Best Software, Most Predictable Freight

Mesa, AZ · Burlington, ON
King of Steel Value & Freight Transparency
2 days (steel) • 20+ days (HDPE/phenolic)

Hadrian Manufacturing runs out of Mesa, Arizona and Burlington, Ontario with some of the most aggressive pricing in the industry on powder coated steel and stainless steel. Their real edge is software: their design and quoting portal is the best in Division 10, and they are the only U.S. manufacturer that exposes selectable LTL freight windows of 1 to 3 business days. Every other manufacturer assigns the carrier after the fact — which turns delivery tracking into a guessing game. Hadrian also has a wide array of steel colors shipping in 2 days. The trade-off: their solid plastic and phenolic lead times have been running 20 business days or longer.

Strengths
  • Lowest-priced powder coated and stainless steel in the industry
  • Huge color selection in 2-day Fast Track steel
  • Best design and quoting software in Division 10
  • Only manufacturer with selectable LTL freight (1–3 business days)
  • Real-time production and shipment tracking portal
  • Excellent ADA and custom configuration support
Trade-offs
  • Solid plastic (HDPE) lead times 20+ business days
  • Phenolic lead times 20+ business days (recently 55+)
  • Limited rush options on non-steel materials
Material Lead Times
Powder Coated Steel
2 days
Stainless Steel
2 days
Solid Plastic (HDPE)
20+ days
Phenolic
20+ days
Plastic Laminate
N/A
All American (AAMCO) logo

All American (AAMCO)

Family-Run, Fastest Stainless, Lowest HDPE Price

Freeport, NY
King of Stainless Steel Speed & Solid Plastic Value
1 day (stainless) • 10 days (HDPE)

All American Metal Corp (AAMCO) is a small family-run factory in Freeport, New York with some of the best customer service in the industry — the kind where the owner still answers the phone. Their stainless steel lead times are the fastest in North America, as short as 1 business day, and they ship solid plastic (HDPE) in 10 business days at the lowest market price. Their powder coated program also has a strong color lineup at a very competitive price. The one caveat: AAMCO freight can be unpredictable — they use the same LTL carriers as everyone else, but the carrier is assigned after production, making it hard to pin down exact delivery dates.

Strengths
  • Fastest stainless steel lead time in the U.S. (as fast as 1 business day)
  • Lowest-priced solid plastic (HDPE) on the market
  • Excellent powder coated color selection at competitive pricing
  • Family-owned with hands-on customer service
  • 10 business day HDPE turnaround — fastest outside ASI
  • Full Division 10 product line (metal, HDPE, phenolic, laminate)
Trade-offs
  • LTL freight timing is unpredictable — no customer-facing shipment portal
  • Smaller production capacity than ASI or Hadrian
  • Not typically specified by architects on large A&D projects
Material Lead Times
Stainless Steel
1 day
Solid Plastic (HDPE)
10 days
Powder Coated Steel
2–5 days
Phenolic
10–15 days
Plastic Laminate
10–15 days

Scranton Products

The Premium Solid Plastic (HDPE) Leader

Scranton, PA
King of Premium Solid Plastic (HDPE)
10–15 business days

Scranton Products — maker of the iconic Hiny Hiders, Aria, and Eclipse lines — is the king of solid plastic (HDPE) partitions and the brand most frequently specified by architects on institutional projects. Their HDPE is regarded as the highest-quality finish in the industry and carries a class-leading 25-year warranty. The catch is price: Scranton sits at the premium end of the market, often 25–40% higher than AAMCO or ASI on equivalent HDPE configurations. If you're matching a Division 10 spec that calls out Scranton Products by name, this is the only option.

Strengths
  • Highest-quality solid plastic (HDPE) finish in the industry
  • Most-specified brand by architects on institutional HDPE projects
  • 25-year manufacturer warranty on HDPE
  • Hiny Hiders, Aria, and Eclipse brand legacy
  • Premium color and texture options
Trade-offs
  • Most expensive HDPE on the market (25–40% premium)
  • HDPE-only — no steel, phenolic, or laminate lines
  • 10–15 business day lead times on standard orders
Material Lead Times
Solid Plastic (HDPE)
10–15 days
Powder Coated Steel
N/A
Stainless Steel
N/A
Phenolic
N/A
Plastic Laminate
N/A
Bobrick Washroom Equipment logo

Bobrick Washroom Equipment

The Phenolic & Washroom Accessories Authority

North Hollywood, CA
King of Premium Phenolic & Accessories
15–20 business days

Bobrick Washroom Equipment is the phenolic leader for architectural specifications — if you see a Division 10 spec calling for solid phenolic, there's a good chance it references Bobrick DuraLineSeries, SierraSeries, or DesignerSeries. Bobrick also dominates commercial washroom accessories (soap dispensers, paper towel dispensers, grab bars), making them a natural choice when the partition and accessory package are being sourced together. Their phenolic is beautiful and durable but carries a premium price tag and 15–20 business day lead times on standard orders.

Strengths
  • Most-specified phenolic brand in U.S. architectural specs
  • Full washroom accessories line (soap, paper, grab bars)
  • Premium finish quality and durability
  • 10-year phenolic warranty
  • Global distribution and project support
Trade-offs
  • Premium pricing on phenolic
  • 15–20 business day standard lead times
  • Metal partition lines are less competitive vs. Hadrian / AAMCO
Material Lead Times
Phenolic
15–20 days
Solid Plastic (HDPE)
15–20 days
Plastic Laminate
15–20 days
Stainless Steel
15–20 days
Powder Coated Steel
15–20 days

Metpar Corp

Regional Value for the Southeast

Dayton, TN
King of Tennessee / Southeast Pickup & Transit
5–15 business days

Metpar Corp is a mid-tier manufacturer out of Dayton, Tennessee. In a national comparison, Metpar's powder coated steel program is usually beaten on price and lead time by both Hadrian and AAMCO, which makes them a hard default recommendation. Where Metpar shines is regional proximity for the Southeast — customers in Tennessee, Georgia, Kentucky, and Alabama can get short transit times and even factory pickup on smaller orders, which can save freight and tighten schedules on rush projects.

Strengths
  • Factory pickup available for regional (Southeast) customers
  • Short transit times within Tennessee and surrounding states
  • Full Division 10 material lineup
  • Viable for small / rush regional orders
Trade-offs
  • Steel pricing and lead times beaten by Hadrian and AAMCO nationally
  • Less competitive outside the Southeast region
  • No factory Fast Track program equivalent to ASI or Hadrian
Material Lead Times
Powder Coated Steel
5–10 days
Stainless Steel
10–15 days
Solid Plastic (HDPE)
10–15 days
Phenolic
15–20 days
Plastic Laminate
10–15 days
Decision Framework

How to Choose the Right Manufacturer

Pick your top priority, follow it to the matching factory.

Fastest Shipping

ASI Global for any material. Hadrian for steel. AAMCO for 1-day stainless.

Lowest Price

Hadrian (steel) · AAMCO (HDPE) · ASI Global (plastic laminate).

Architect-Specified

Scranton (solid plastic) · Bobrick (phenolic).

Predictable Freight

Hadrian is the only factory with selectable 1–3 day LTL windows.

Biggest Color Selection

Hadrian (powder coated) · AAMCO (powder coated) · ASI (phenolic).

Regional Pickup

Metpar (Dayton, TN) for Southeast customers.

Warranties

What's Actually Covered

Manufacturer warranties vary by material. Here's what the industry standard looks like in 2026.

Material
Warranty
Solid Plastic (HDPE)
25 years
Phenolic
10–25 years
Stainless Steel
5 years
Powder Coated Steel
3–15 years
Plastic Laminate
3–5 years

Warranty terms vary by manufacturer, environment, and installation. Always verify the specific coverage document with your distributor before finalizing a spec. Partition Pros provides manufacturer warranty documentation with every order at no charge.

Pricing Guide

What Bathroom Partitions Actually Cost

2026 per-stall pricing ranges (52" door, standard hardware, excluding freight). Real quotes vary by quantity, configuration, color, and shipping location.

Budget

$
$650 – $850 / stall

Plastic Laminate (ASI) · Powder Coated Steel (Hadrian)

Mid-Range

$$
$850 – $1,100 / stall

Powder Coated (AAMCO) · HDPE (AAMCO) · Stainless Steel (Hadrian)

Premium

$$$
$1,100 – $1,400 / stall

Scranton HDPE · Bobrick Phenolic · ASI Fast Track HDPE

High Spec / Custom

$$$$
$1,400+ / stall

Stainless Steel custom finishes · Full-height privacy packages · Color-Thru Phenolic

Want a real number for your specific project? Try our free stall quote calculator — built from 312 real quotes over the last 3 months. Or request a custom quote and we'll match you to the right factory.

FAQ

Common Questions

How many bathroom partition manufacturers are there in the United States?

There are roughly six major U.S. bathroom partition manufacturers: ASI Global Partitions, Hadrian Manufacturing, All American Metal Corp (AAMCO), Scranton Products, Bobrick Washroom Equipment, and Metpar. Each has material specialties, pricing tiers, and lead time differences that make them better suited to specific projects.

Which bathroom partition manufacturer has the fastest lead times?

ASI Global Partitions is the only factory in the U.S. capable of shipping all five materials — powder coated steel, stainless steel, solid plastic, phenolic, and plastic laminate — in 2 business days. Hadrian ships powder coated and stainless steel in 2 days. All American (AAMCO) ships stainless steel in as little as 1 business day.

Who makes the best solid plastic (HDPE) bathroom partitions?

Scranton Products is widely considered the premium leader in solid plastic (HDPE) partitions and is specified by architects on large projects — but it is also the most expensive. All American (AAMCO) offers the lowest price on solid plastic with a 10 business day lead time. ASI Global is the only manufacturer that extrudes their own HDPE sheet, giving them full vertical control and 2-day lead times.

Who makes the best phenolic bathroom partitions?

Bobrick is the phenolic leader for architectural specifications. ASI Global Partitions is the only manufacturer capable of shipping phenolic in 2 business days via their Global Fast Track program. Hadrian phenolic lead times currently run 20+ business days.

Which manufacturer has the cheapest plastic laminate partitions?

ASI Global Partitions offers the lowest-priced plastic laminate partitions in the industry and is the only factory capable of shipping plastic laminate in 2 business days.

Does Hadrian provide delivery tracking for LTL freight?

Yes. Hadrian is currently the only partition manufacturer that exposes LTL freight timing through their internal portal, letting customers pick shipping windows of 1 to 3 business days. Other manufacturers assign the LTL carrier after the order ships, making precise delivery estimates difficult.

What warranties come with bathroom partitions?

Solid plastic (HDPE) partitions typically carry 25-year manufacturer warranties. Phenolic partitions carry 10 to 25-year warranties depending on manufacturer. Powder coated steel warranties range from 3 to 15 years. Stainless steel partitions are typically backed by 5-year warranties.

How much do commercial bathroom partitions cost?

Per-stall pricing (2026) ranges from roughly $650 to $1,400 depending on material, manufacturer, and configuration. Plastic laminate from ASI Global is the most budget-friendly; Scranton Products solid plastic and Bobrick phenolic sit at the premium end. Freight, hardware upgrades, and mounting style also affect total cost.

Can Partition Pros help me choose the right manufacturer?

Yes. Partition Pros is an authorized distributor for every major U.S. partition manufacturer. We analyze your project requirements — material, budget, lead time, spec compliance, and shipping location — and source the best manufacturer for your needs at factory-direct pricing.

Stop Guessing

Let Partition Pros source the best manufacturer for your project.

We're authorized distributors for ASI Global, Hadrian, AAMCO, Scranton Products, Bobrick, and Metpar. One quote, one point of contact, factory-direct pricing — and we'll pick the factory that actually fits your project.

Free submittal package • Free spec cross-reference • Nationwide shipping & installation

The Ultimate Guide to Bathroom Partition Manufacturers (2026) | ASI, Hadrian, AAMCO, Scranton, Bobrick, Metpar Compared